This chapter explains how to design disaster recovery in Resource Orchestrator.
Main Items | Reference |
---|---|
Switchover Methods | Refer to "2.1 Switchover Methods". |
Switchover operations | Refer to "2.2 Switchover Operation". |
Switchover levels | Refer to "2.3 Switchover Levels". |
Limitation of switchover scope and additional recovery | Refer to "2.4 Limitation of switchover scope and additional recovery". |
Configuration for blade chassis degradation | Refer to "2.5 Degrading Blade Chassis". |
Configurations | Refer to "2.6 Configurations of the Switchover Source and Destination Sites". |
Licenses | Refer to "2.7 Necessary Licenses". |
Estimation of capacity of disks that will be replicated | Refer to "2.8 Estimation of Disk Capacity". |
Estimation of capacity of disks that will not be replicated | |
Advisory notes for Disaster Recovery environments | Refer to "2.9 Advisory Notes for Disaster Recovery Environments". |
System configuration | Refer to "2.10 System configuration". |
The combinations of switchover methods, switchover operations, and switchover units supported by DR Option are as follows:
Switchover Methods | Switchover operations | Switchover levels | Support Availability |
---|---|---|---|
"Physical L-Server switchover (physical OS)" | Active-Active Operation | Site switchover | No |
Tenant switchover | Yes | ||
Active-Standby Operation | Site switchover | Yes | |
Tenant switchover | Yes | ||
"Physical/virtual L-Server switchover (VM host/VM guest)" | Active-Active Operation | Site switchover | No |
Tenant switchover | No | ||
Active-Standby Operation | Site switchover | Yes | |
Tenant switchover | No | ||
"Virtual L-Server switchover (VM guest)" | Active-Active Operation | Site switchover | No |
Tenant switchover | Yes | ||
Active-Standby Operation | Site switchover | Yes | |
Tenant switchover | Yes |
The combinations of physical servers and the Disaster Recovery function supported by DR Option are as follows:
Function | PRIMERGY blade servers | PRIMERGY rack mount servers | SPARC Server | |
---|---|---|---|---|
Switchover Methods | Physical L-Server Switchover | Yes | Yes | No |
Physical/Virtual L-Server Switchover | Yes | Yes | No | |
Virtual L-Server Switchover | Yes | Yes | Yes | |
Switchover operations | Active-Standby Operation | Yes | Yes | No |
Active-Active Operation | Yes | Yes | Yes | |
Switchover levels | Site switchover | Yes | Yes | No |
Tenant switchover | Yes | Yes | Yes | |
Limitation of switchover scope and additional recovery | Limitation of switchover scope | Yes | Yes | Yes |
Additional Recovery | Yes | Yes | Yes | |
Configuration for blade chassis degradation | Yes | - | - | |
Switchover target | Virtual L-Servers | Yes | Yes | Yes |
Virtual L-Servers linked with virtual servers | Yes | Yes | No | |
Physical L-Servers | Yes | Yes | No | |
Physical L-Servers linked with physical servers | No | No | No | |
L-Servers with definitions only | No | No | No |
Yes: Supported
No: Not supported
-: Not applicable