Top
Systemwalker Operation Manager  User's Guide
FUJITSU Software

14.3.2 Group Scheduling Method

For groups, the status of the previous day affects the scheduling method.

When group is completed normally or pseudo-normal

Upon the day change time, the groups for the current day will be scheduled and be in the waiting status.

When group is executing or warning

If the group remains in the executing or the warning status beyond the day change time, the groups for the current day will be scheduled at the time of the group completion depending on the completion status (Completed, Pseudo-normal, Abended or Cancelled).

When in the normally completed or pseudo-normal status, the group will be in the waiting status.

When in the abended or cancelled status, the scheduling method will depend on whether or not the confirm operation is enabled. See "When group is abended" and "When group is cancelled".

When group is paused

When the day change time comes while the group is in the paused status, the group will remain in the paused status and will not be scheduled for the current day.

If the execution conditions for the paused group are satisfied when it is resumed, the group will be executed and then scheduled for the current day. Furthermore, if the execution conditions for the current day are satisfied, the groups for the current day will continuously be executed.

When group is disabled

When the startup time comes while the group is in the disabled status, the group will be skipped and be pseudo-normal. Also, since the scheduled startup time for the current day is set when the group has been skipped, the startup schedules for the current day will not be carried over to the next day.

When group is abended

When the group has been abended, the scheduling method will vary depending on whether the confirm operation is enabled.

Whether confirmation operations are enabled is specified using the Advanced Settings for Verification window (which is displayed by clicking the Advanced Settings button under Verification at error occurrence in the Use function1 sheet of the Define Jobscheduler Startup Parameters window).

When confirm operation is not enabled

The abended group will be scheduled at the day change time and be in the waiting status.

When confirm operation is enabled

When the confirm operation is enabled, the job net status will be as follows.

If the restart operation is executed to the group which remains in the abended status beyond the day change time, the group will start execution, upon the restart operation, from the abended job in the abended job net or from the restart point. After the group completion, it will be re-scheduled depending on the group status.

When group is cancelled

When Systemwalker Operation Manager on the schedule server is V10.0 or earlier, the canceled group is re-scheduled after the day change time. The group status is changed from canceled to waiting to be executed.

For V10.1 or later versions, whether the confirm operation is enabled affects the scheduling method.

The Check canceled and the Validate group confirmation check boxes in the Advanced Settings for Verification window (which is displayed by clicking the Advanced Settings button in Verification at error occurrence in the Use function1 sheet of the Define Jobscheduler Startup Parameters window) determine whether confirmation is enabled.

When the confirm operation is enabled, the scheduling method is the same as when the group is in abended status. Just replace "abended" with "cancelled."

When the confirm operation is not enabled, the cancelled group will be scheduled at the day change time.

When group is waiting

When the day change time comes while the group is in the waiting status, the group will remain in the waiting status.

If the execution conditions for the waiting group are satisfied, the group will be executed and then scheduled for the current day.