Machine Administration Guide 2.6 |
Contents
Index
![]() ![]() |
Chapter 3 Model Family-Specific Information | > 3.3 PRIMEPOWER650/850/900/1500/2500/HPC2500 |
Machine Administration supports three types of settings. The first type of settings are made when the main unit is installed. The second type of settings are made when the main unit is in operation. The third type of settings are made as required.
The tables below show settings to be made and the persons in charge responsible for making these settings.
The meanings of symbols in the "Person in charge" column are as follows.
Y: The customer engineer or system administrator makes the appropriate setting.
-: Other persons in charge make the appropriate setting.
When to make the setting |
|
Person in charge |
|||
---|---|---|---|---|---|
Contents of the setting |
Reference destination |
Customer engineer |
System administrator |
||
At installation of the main unit |
|||||
|
Monitoring battery life (*1) |
Y |
- |
||
Setting Monitoring Notification Information |
- |
Y |
|||
Add Schedule Entry |
- |
Y |
|||
Add Holiday |
- |
Y |
|||
Warm-up Time Administration |
- |
Y |
|||
Setting the External Equipment Wait Time |
- |
Y |
|||
Setting waiting time for shutdown at power failure |
- |
Y |
|||
Remote Customer Support System (REMCS) Setup Menu |
- |
Y |
|||
When the main unit is in operation |
|||||
|
When an error occurs/when a part is replaced |
Disk Monitoring |
- |
Y |
|
When an error is occured |
Tape Unit Monitoring |
- |
Y |
||
As required |
Add Schedule Entry |
- |
Y |
||
Add Holiday |
- |
Y |
|||
Reconfiguring The RCI Network |
- |
Y |
|||
Initial RCI Network Setup |
- |
Y |
|||
Setting Up and Testing the AP-Net |
- |
Y |
|||
HCP File Operation |
- |
Y |
*1 Make this setting not only when installing the main unit but also when performing preventive swapping.
Contents
Index
![]() ![]() |