Machine Administration Guide 2.6
Contents Index PreviousNext

Chapter 3 Model Family-Specific Information> 3.3 PRIMEPOWER650/850/900/1500/2500/HPC2500

3.3.13 Setting Up and Testing the AP-Net

This section describes how to perform the Setting Up and Testing the AP-Net operation.

The CE performs Setting Up and Testing the AP-Net.

Displaying Option Menu

Operation

  1. From the CUI menu, select [Option Menu].

    The Option menu opens.

Setting up the AP-Net

Operation

  1. From the Option Menu, select [Setting Up and Testing the AP-Net].

    The AP-Net menu opens. (This menu is not included in the Machine Administration menu.)

  2. Select the following items from the menu:
  3. Select [Initialize and test of AP-Net case] from the menu.
  4. From this point, perform operations according to the menu.
  5. Check the setting.

    If an error is detected, perform the setting again.

Testing AP-Net connection

Operation

  1. From the Option Menu, select [Setting Up and Testing the AP-Net].

    The AP-Net menu opens. (This menu is not included in the Machine Administration menu.)

  2. Select the following items from the menu:
  3. From the menu, select [Connection test of MSC-RTC].
  4. From this point, perform operations according to the menu.

    When the AP-Net connection test finishes, [All tests ended (return)] appears.


Contents Index PreviousNext