PRIMECLUSTER Installation and Administration Guide 4.1 (for Solaris(TM) Operating System)
Contents Index PreviousNext

Part 4 System Configuration Modification> Chapter 8 Changing the Operation Configuration> 8.1 Changing the Cluster Configuration

8.1.3 Changing Resources

The resource modification includes the followings:

  1. Change the interface used by a resource.
  2. Change the attributes to the resources and resource interfaces.

Resources can be changed only when RMS is stopped.

Down8.1.3.1 Changing the Interface Used by a Resource
Down8.1.3.2 Changing the Attributes Used by a Resource or a Resource Interface

Contents Index PreviousNext

All Rights Reserved, Copyright (C) FUJITSU LIMITED 2005