4.3 Q: If I Have Configured Job Net Startup to be Triggered by a Message Event, is the Schedule Displayed in the Gantt Chart?

Applicable versions and levels

A

The Gantt chart is a window for confirming the execution status of each job along a time axis. The chart is displayed according to the settings, as explained below: