The operation procedure to confirm the machine information of the machine that has been configured is shown as follows.
Right-click the machine that has been configured, and click Confirm Device Information in the displayed menu.
*The confirmation of machine information in selected status for multiple machines cannot be performed.
The Confirm Device Information window will be displayed.
Device Information tab
Item | Description |
---|---|
Assets Number | Asset number of machine. |
Related Assets Number | Related asset number of machine. |
Class | Category information of machine. |
Type | Type information of machine. |
Setup Place | Setting location information of machine. |
Manufacturer Name | Manufacturer name of machine. |
Model Name | Model name of machine. |
Serial Number. | Serial number of machine. |
Asset Classification | Asset classification of machine. |
Availability | Availability of machine. |
Device Name | The name used as machine. |
Date of Manufacture | The year and month when the machine is manufactured. |
Date of Registration | Year, month and date of registration to the asset ledger of machine. |
Section | Information of section. |
Use ID | User ID of the user that uses the machine. |
User Name | User name that uses the machine. |
Path Name of Link | Data related to machine (e.g. image of machine), as well as folder and URL that contains such data. |
Processor Name | Processor name of the PC. |
Clock Number | Clock number of CPU of the PC. |
Total Memory Capacity | Total memory capacity of PC. |
Total Disk Capacity | Total capacity of hard disk of PC. |
Total Remaining Disk Capacity | Remaining capacity of hard disk of PC. |
OS Name | OS name of PC. |
Service Component | Service components applied to PC. |
IP Address 1 | IP address set for PC.
|
IP Address 2 | IP address set for PC.
|
MAC Address 1 | MAC address set for PC. |
MAC Address 2 | MAC address set for PC. |
Collection Information | It shows the existence as PC inventory information on the database of DTP. |
Collection Date/Time | Date and time when information is registered. |
Detection Date/Time | Date and time when machine is detected in ADT. |
Completion Date of Stocktaking | Date and time when stocktaking has completed. |
User Memo tab
*It is not displayed when all the item names of user memo are "Unused".
Item | Description |
---|---|
User Memo 1~60 | User memo of machine. |
User Information tab
* It is not displayed when all the item names of user information are not defined.
Item | Description |
---|---|
Inherent Item of User Information | The user memo that is set freely as the inventory information of DTP. The item name and user memo set by user will be displayed. For example, when "Property ID" has been set by user, "Property ID" will be displayed. |
Contract Information tab
*It is not displayed when the machine has no lease/rental contract.
Item | Description |
---|---|
Contract Class | Category information of contract. |
Contract No. | Information of contract number. |
Original Contract No. | Information of contract number before contract extension. |
Installation Code | Contract No. when the contract is managed by contract company. |
Cost Burden Origin | Information of the cost bearing party of contract. |
Contract Company | Contracted company name. |
Contract Name | Contracted article name. |
Contract Date | Contracted date of the contract. |
Contract Start Date | Contracted start date of contract. |
Contract End Date | Contracted termination date of contract. |
Contract Value | Contracted price of contract. |
Payment Type Name | Payment method such as monthly payment or yearly payment .etc. |
Officer Name | Contract officer name. |
Phone No. of Officer | Telephone number of contract officer. |
Fax No. of Officer | Fax number of contract officer. |
Remarks | Remarks information of contract. |
Administrator Memo 1~6 | Memo information of contract. |
Maintenance Contract Information tab
*It is not displayed when the machine is not bounded with any maintenance contract.
Item | Description |
---|---|
Mainte Code | Information of the number of maintenance contract. |
Original Mainte Code | Information of the number of maintenance contract before contract extension. |
Installation Code | Contract No. when the contract is managed by contract company. |
Cost Burden Origin | Information of the cost bearing party of contract. |
Contract Company | Contracted company name. |
Contract Name | Contracted article name. |
Contract Date | Contracted date of the contract. |
Contract Start Date | Contracted start date of contract. |
Contract End Date | Contracted termination date of contract. |
Contract Value | Contracted price of contract. |
Payment Type Name | Payment method such as monthly payment or yearly payment .etc. |
Officer Name | Contract officer name. |
Phone No. of Officer | Telephone number of contract officer. |
Fax No. of Officer | Fax number of contract officer. |
Remarks | Remarks information of contract. |
Administrator Memo1~6 | Memo information of contract. |
Security Auditing Result tab
* It is not displayed when the category of machine is not PC.
Item | Description |
---|---|
Audit Pointer | Select the Audit Pointer to confirm the result of security auditing. The result of selected Audit Pointer will be displayed in the Auditing Result. |
Auditing Result | The result of Audit Pointer will be displayed for each auditing item. When the auditing result is OK, o will be displayed. When the auditing result is failed, x will be displayed. |