The information of job properties can be changed temporarily while the status of each job and its job net remain. The temporarily changed information is only valid when the job net is "restart." If the job net is "start," the temporarily changed information of the entire job net is cleared. When the job net is being executed or when its alarm is reported, you cannot temporarily change the job information.
You can use this option when recovering a job.
The following describes how to do so.
Job information that can be changed
The following items can be temporarily-changed.
Upper limit of code completion/Ignore completion code/Do not save standard/error output in the Standard information sheet of Monitor-Job window
Restart point/Invalid at next restart/Restart previous job/Execution condition in the Control information sheet of Monitor-Job window
Estimated processing time in the Detail information sheet of the Monitor-Job window
Procedure
The following gives the procedure.
Displaying the Monitor-Job window
Display the Monitor-Job window by performing one of the following operations.
Select the job you want to change, then select Properties from the File menu.
Select the job you want to change, then select Properties from the shortcut menu.
Double-click the job you want to change.
Changing the job temporarily
Change the job information using the Standard information, Control information or Detail information sheet of the Monitor-Job window.
Point
Property information of temporarily changed jobs
The property information of a temporarily changed job is reset when the job net is "start." However, the property information of the job is not changed. If you need to change the property information of a job while keeping the status of each job and its job net, use the Change Recovery option for the job. For details, see "4.4.9 Recovery-Changing the Job Information".
Point
Required rights for Temporarily change of the job
The Operation Right or Update Right is required to temporarily change a job.