Applicable versions and levels
Windows versions: V5.0L10 or later
Solaris versions: 5.0 or later
Linux versions: 5.2, V10.0L10 or later
Linux for Itanium versions: V12.0L10 or later
HP-UX versions: 5.1 or later
AIX versions: 5.1 or later
DS versions: V20L10
Action
Cause
This completion code is reserved by Systemwalker Operation Manager (Jobscheduler). It is expressed in decimal.
Action method
Refer to "5.1.1 I do not Understand the Meaning of the Job Completion Code" of "5.1 The Job Execution Result is Abnormal" for information on the meaning of each completion code.
If the job completion code is 256 or more, Jobscheduler displays the completion code as 255.
The actual completion code of the job can be checked in the Job History window.
If an application registered as a job returns a completion code from 201 to 256, it will not be possible to identify from the information displayed in the Job History window whether that completion code was set by Jobscheduler, or is a completion code that was returned by the application.
In this case, the completion code that was returned by the application can be checked using the mjsview command.
The job completion codes are also explained in the following manuals. Use these in conjunction with this document.
V11.0L10/11.0 or later
"Job Completion Codes" in the Reference Guide
"Completion Codes" in the Online Help
V11.0L10/11.0 or earlier
"Job Completion Codes" in the Reference Guide