Top
Systemwalker Operation Manager Troubleshooting Guide
FUJITSU Software

4.2.7 Even though the Job Net should not Start on the Current Day because of the Invalid period setting on the Operation period tab in Job Net Properties, it does Start

Applicable versions and levels

Action

Points to check

Cause

If Start only when message event has occurred is specified and Valid only on startup days is not specified, the job net starts when a message event is generated. Additionally, for job nets for which the start operation is performed, the job will start even if Invalid period is set.

Action method

If you do not want the job net to start according to any execution condition, disable the job net.