4.1.13 The Group Started after the Confirm Operation

Applicable versions and levels

Action

Points to check

Was the confirm operation performed after the scheduled start time of the group was exceeded?

Cause

If the confirm operation for the group is valid, the next start of the group will be rescheduled at the point when the confirm operation is performed. If the scheduled start time arrives after the scheduling, the group will start instantly.

Note that, if a group is waiting for message events, the group will start at the point when a message event is generated and the execution condition is met.