The demand forecasting of the resource pool can be done by using Systemwalker Service Quality Coordinator.
Because an amount of the resource insufficient in prior is predictable, the reinforcement plan of equipment with high accuracy can be set up.
Here, it explains the procedure that does the resource demand forecasting in the future by using the scenario of the ServerView Resource Orchestrator Resource Pool category.
Demand forecasting
The VM Pool (CPU) (demand forecast) report of the ServerView Resource Orchestrator Resource Pool category is selected with Analysis/Planning window, the analytical condition is set, and the report is displayed.
Please refer to "4.3 How to Operate the Analysis/Planning Window" for the setting method of the analytical condition.
The regression analysis is done from a past use performance of VM Pool(CPU), and how many resources is used is forecast.
The report of the as needed and others is displayed, and the demand forecasting of the resource pool is done.