Top
Systemwalker Service Quality Coordinator User's Guide (Console Edition)
Systemwalker

4.3.3 Period

"Period" region is displayed by the kind of the report. The content is different depending on the specified report type.

It is an example of the screen as follows.


Period/Analysis Period

Item

Description

Start date

End date

The period assumed to be an analysis Element is specified.

The date and time are selected from the pull-down menu, and the starting date of the analysis and the completion date are specified.


Forecast Date