Top
Systemwalker Operation Manager Q & A Guide

4.10 Q: How Can I Change the Execution Time of Job Nets in a Group without Deleting the Group?

Applicable versions and levels

A

You can change the execution time of job nets in a group without deleting the group. The execution time cannot be changed in the Change Group window, so use the following procedure:

  1. In the job tree, select job nets in any group and display their properties.

You can also change the structure of job nets in a group. Use the Change Group window to change the structure (add, delete, or change the flow) of job nets in a group.

Make these changes when the group is not in Executing or Warning status.