Top
ETERNUS SF Express V16.9 / Storage Cruiser V16.9 / AdvancedCopy Manager V16.9 Migration Guide
FUJITSU Storage

7.7.2 Upgrading on Clustered Systems

7.7.2.1 Preparing for Upgrade

Point

It is recommended that you back up the following resources before starting the upgrade.
By preparing a backup, in cases when an error occurs during the upgrade, it is possible to return the system to its state prior to the upgrade, simply by recovering (restoring) the system from the backup.

  • System (the primary node and the secondary node)

  • The shared disk for shared data of the AdvancedCopy Manager CCM

  1. Login to the server on which to perform the tasks. Perform operations after logging in with root (superuser).

  2. Ensure that there is enough available disk space (100 MB) on the server where the upgrade is performed on the secondary node.

    In cases when upgrade installation is executed in a state where the capacity required for the upgrade is not available, the following message is displayed and the installation terminates in an error. Re-execute the upgrade after securing the capacity required for the installation.

    Output Message (in cases when the directory of the destination of the installation is "/opt"):

    ERROR:Disk /opt has an insufficient free space. Please execute it again after increasing the disk area.
  3. Check that the CCM Server transactions are stopped on the secondary node.

    If not stopped, stop the transaction of AdvancedCopy Manager Copy Control Module.
    Refer to the relevant cluster software manuals for information on stopping it.

  4. On the secondary node, recover the start and stop script of the CCM Server transaction.

  5. Ensure that there is enough available disk space (100 MB) on the server where the upgrade is performed on the primary node.

    In cases when upgrade installation is executed in a state where the capacity required for the upgrade is not available, the following message is displayed and the installation terminates in an error. Re-execute the upgrade after securing the capacity required for the installation.

    Output Message (in cases when the directory of the destination of the installation is "/opt"):

    ERROR:Disk /opt has an insufficient free space. Please execute it again after increasing the disk area.
  6. Stop the CCM Server transaction on the primary node.

    Refer to the relevant cluster software manuals for information on stopping it.
    The shared disk for shared data of AdvancedCopy Manager Copy Control Module must be mounted.

  7. On the primary node, recover the start and stop script of the CCM Server transaction.

7.7.2.2 Performing Upgrade (Primary Node)

  1. Refer to "C.8 Procedures for Upgrade Installation of AdvancedCopy Manager Copy Control Module Version 16.x (for Solaris, Linux)" and perform the Upgrade Installation.

  2. The shared disk for shared data of AdvancedCopy Manager Copy Control Module must be unmounted.

Point

If the Upgrade Installation has ended in an error, after removing the cause of the failure of the Upgrade Installation, re-execute the installation from the execution of the installation shell.

7.7.2.3 Performing Upgrade (Secondary Node)

  1. The shared disk for shared data of AdvancedCopy Manager Copy Control Module must be mounted.

  2. Refer to "C.8 Procedures for Upgrade Installation of AdvancedCopy Manager Copy Control Module Version 16.x (for Solaris, Linux)" and perform the Upgrade Installation.

  3. The shared disk for shared data of AdvancedCopy Manager Copy Control Module must be unmounted.

Point

If the Upgrade Installation has ended in an error, after removing the cause of the failure of the Upgrade Installation, re-execute the installation from the execution of the installation shell.

7.7.2.4 Tasks to Be Performed After Upgrade (Primary Node)

After installing the upgrade of the primary node, recover the activation suspension script for the CCM server tasks saved in "7.7.2.1 Preparing for Upgrade".

The shared disk for shared data of AdvancedCopy Manager Copy Control Module must be mounted.

7.7.2.5 Tasks to Be Performed After Upgrade (Secondary Node)

After installing the upgrade of the secondary node, recover the activation suspension script for the CCM server tasks saved in "7.7.2.1 Preparing for Upgrade".

7.7.2.6 Start CCM Server Transactions

On the primary node, start the transactions of AdvancedCopy Manager Copy Control Module.

Refer to the relevant cluster software manuals for information on starting it.
Check that the CCM Server transactions are stopped on the secondary node.

If not stopped, stop the CCM Server transactions. Refer to the relevant cluster software manuals for information on stopping it.