Top
Systemwalker Operation Manager  User's Guide
FUJITSU Software

4.4.3 Changing the Job Net Information

The job net information (standard information, message information, and startup day information) can be changed as necessary. This section describes the job net information that can be changed. For procedure and cautions on changing the job net information, see "4.2.5 Job Net Information Settings".

Note

When changing the execution condition to None

If you have set the Execution condition and if you set this Execution condition to None, all the settings made in the Message sheet of the Job Net Properties window are cleared.

Note

Changing the job net information after message events have occurred

Changes made to the job net information clear any message events that have already occurred. These message events must be reissued once the job net information is changed.

However, message events that have occurred will not be cleared when only the following information is changed:

Standard information sheet >> Job net comment, Startup on power-on if power is off during scheduled execution, Start at the time of server startup >> Once in a day, Default host name

Note

Changing the job net information if its scheduled time has passed

  • If the startup conditions are not satisfied when the scheduled time is reached and if the information of a non-started job net is changed, the job nets are rescheduled and the next scheduled time is set for them. (The previous scheduled time is cleared.)

  • If the startup conditions are not satisfied when the scheduled time is reached and if the information of a group-internal job net is changed, the group is also rescheduled and the next scheduled time is set for them. (The previous scheduled time is cleared.)

Note

Changes to information when job was abended

If the job information is changed, the status of all jobs in the job net is set to "Waiting" using Change Job Net window. In this case, the job net restarts from the first job.

Note

Changes to the startup days, calendar, or operation period information

When the startup day, calendar or operation period information for a job net (that uses a calendar with a reschedule date setting) is changed using the Startup days sheet of the Job Net Properties window before the reschedule date comes, the reschedule data setting in the Save Calendar window becomes invalid and the information changed in the Job Net Properties window becomes valid.

Also note that the above change will affect on all the job nets that are using this startup day if the job net to be changed is the base job net.

Note

Changing linked job nets

Job net information for linked job nets, and job nets at levels below the linked job nets, cannot be changed. To change the job net information for a linked job net, change the master linked job net that the linked job net refers to.

Information

Changing the startup days of child job nets

The startup days of child job nets can be changed even when the parent job net is started. The change is effective from the next startup unless the job net confirmation operation is enabled and the parent job net is abended.