Top
PRIMECLUSTER  Reliant Monitor Services (RMS) with Wizard Tools Configuration and Administration Guide 4.6
FUJITSU Software

3.2 General configuration procedure

RMS configuration always involves these four steps:

  1. Stop RMS.

    Refer to the "7.1.3 Stopping RMS". You can use the Cluster Admin GUI or the command line interface from any node in the cluster.

  2. Create or edit the configuration.

    Refer to "3.3 Creating and editing a configuration"

  3. Activate the configuration.

    Activation includes generation and distribution. See the "3.4 Activating a configuration".

  4. Start RMS.

    Refer to the "7.1.1 Starting RMS". You can use the Cluster Admin GUI or the command line interface from any node in the cluster.