The log saving period and timing for log backup, etc., are usually the information set at the system design/installation.
However, after regular backup of the collected logs has been started, the log amount may exceed the expected amount that requires a change of settings. In this case, the balance between the log saving period and amount of collected log can be obtained by modifying the log saving period.
The following are two change methods:
When executing regular backup of logs manually using backup tool (GUI)
In the Backup Tool window of Backup Tool, modify Backup object period or Deletion object period.
When executing regular backup of logs automatically using scheduler
Modify the corresponding period through the parameter of registered command.
For information on how to consider the log saving period and timing for log backup, refer to "Determine How to Use Logs" of Installation Guide.
For details on setting items of the backup tool, commands to be used, change procedures, etc., refer to "Backup User Asset" of Installation Guide.