Reconfigure after operation has started due to a user application
Even after deploying a logical platform (L-Platform), you can change the configuration of the system and the amount of resources (number of CPUs, memory capacity, etc.).
This means that you can deal with an increase in load in a particular department by enhancing the specifications of the system.
Figure 5.25 Reconfiguring after operation has started