The job net information (standard information, message information, and startup day information) can be changed as necessary. This section describes the job net information that can be changed. For procedure and cautions on changing the job net information, see "4.2.5 Job Net Information Settings".
Standard information
Changes standard information on the job net including the job net comment, the execution conditions (None/Execute at/Execution interval/Start at the time of server startup/Start only when message event has occurred), the name of the host submitting the jobs in the job net, etc.
The job net name cannot be changed in the Standard information sheet of the Job Net Properties window. To change the job net name, duplicate the job net and save it with a different name, and then delete the original job net.
For child and master linked job nets, the Execution condition cannot be changed to any settings other than None.
Message Information
Adds or deletes the message events (generated by the jobschmsgevent command) to wait for as the startup timings of job nets. The job net execution conditions for situations where message events are issued are also changed here.
Startup Days Information
Changes the basic startup schedules (or startup days) for job nets. The startup days can be specified by either of the following two methods. Use each method to change the settings.
Change in the Startup days sheet of the Job Net Properties window.
Change (fine tune) using the Startup Days window or Startup Days (Preview) window.
Note
When changing the execution condition to None
If you have set the Execution condition and if you set this Execution condition to None, all of the settings made in the Message sheet of the Job Net Properties window are cleared. If the destination server is running Systemwalker Operation Manager V12.0L10/V12.1 or earlier, the content of the Message and Startup days sheets will be cleared.
Note
Changing the startup time
Changes made to the job net startup time clears any message events that have already occurred. These message events must be re-issued once the startup time is changed.
Note
Changing the job net information if its scheduled time has passed
If the startup conditions are not satisfied when the scheduled time is reached and if the information of a non-started job net is changed, the job nets are rescheduled and the next scheduled time is set for them. (The previous scheduled time is cleared.)
If the startup conditions are not satisfied when the scheduled time is reached and if the information of a group-internal job net is changed, the group is also rescheduled and the next scheduled time is set for them. (The previous scheduled time is cleared.)
Note
Changes to information when job was abended
The all jobs status in job net are set the waiting status when a job information changes using Change Job Net window. In this case, the job net restarts from the first job.
Note
Changes to the startup days, calendar, or operation period information
When the startup day, calendar or operation period information for a job net (that uses a calendar with a reschedule date setting) is changed using the Startup days sheet of the Job Net Properties window before the reschedule date comes, the reschedule data setting in the Save Calendar window becomes invalid and the information changed in the Job Net Properties window becomes valid.
Also note that the above change will affect on all the job nets that are using this startup day if the job net to be changed is the base job net.
Note
Changing linked job nets
Job net information for linked job nets, and job nets at levels below the linked job nets, cannot be changed. To change the job net information for a linked job net, change the master linked job net that the linked job net refers to.