Systemwalker Operation Manager  Message Guide
FUJITSU Software

3.12 Messages of Client Task Link

This section describes the messages generated by the Client Task Link.

A message is displayed in a message box.

[error]0xe00aa201:The service start processing watch did the time-out.

[Description]

Startup process of the Client Task Link engine has timed out. A port required for the Client Task Link engine to start will probably be unavailable for use.

[System Action]

Terminates the process.

[System Administrator Response]

Due to the reason such as that a port necessary for the Client Task Link engine to start is already in use by other application, the Task Link could be unable to use the port number. Ensure that the port number required for the Task Link service to start is available for use. For more details about the port number used by the Task Link, see the Systemwalker Operation Manager Installation Guide.

Client Task Link has already started.

[Description]

The Client Task Link engine has already started. You cannot start it doubly.

[System Action]

Terminates the process.

Error occurred when Client Task Link engine start.Error Event ID(0xA818)Failed to bind the socket for control path establishment during the initialization of communication controller.

[Description]

Failed to bind the control path establishment reception socket of Client Task Link engine when performing initial processing of communication control section.

[System Action]

Terminates the process.

[System Administrator Response]

Due to the reason such as that a port necessary for the Client Task Link engine to start is already in use by other application, the Task Link could be unable to use the port number. Ensure that the port number required for the Task Link service to start is available for use. For more details about the port number used by the Task Link, see the Systemwalker Operation Manager Installation Guide.

Error occurred when Client Task Link engine start.Error Event ID(0xA81A)Failed to bind the socket for Objects connection during the initialization of communication controller.

[Description]

Failed to bind the Task Link connection socket of Client Task Link engine when performing initial processing of communication control section.

[System Action]

Terminates the process.

[System Administrator Response]

Due to the reason such as that a port necessary for the Client Task Link engine to start is already in use by other application, the Task Link could be unable to use the port number. Ensure that the port number required for the Task Link service to start is available for use. For more details about the port number used by the Task Link, see the Systemwalker Operation Manager Installation Guide.