Was a backup performed while the group, job net, or job was executing?
Cause
If a backup is performed while the group, job net, or job is executing, and that information is then restored, when Jobscheduler starts, the group, job net, or job that was executing when the backup was performed will change to the "Closed" status (completion code = 239).
Action method
Perform the backup while the group, job net, or job is not executing.