Top
Systemwalker Operation Manager Troubleshooting Guide
FUJITSU Software

4.13.19 After the Restore, when Jobscheduler is Started the Group/Job Net/Job Ends Abnormally with Completion Code 239

Applicable versions and levels

Action

Points to check

Was a backup performed while the group, job net, or job was executing?

Cause

If a backup is performed while the group, job net, or job is executing, and that information is then restored, when Jobscheduler starts, the group, job net, or job that was executing when the backup was performed will change to the "Closed" status (completion code = 239).

Action method

Perform the backup while the group, job net, or job is not executing.