4.4.2 When Jobscheduler Starts, the Group/Job Net/Job Ends Abnormally with Completion Code 239

Applicable versions and levels

Action

Points to check

Was restore performed before Jobscheduler started?

Cause

If a group/job net/job with the "Executing" status is restored during the backup, the group/job net/job status will be initialized when Jobscheduler starts after the restore, so the execution is suspended.

Action method

If the confirm operation is enabled, perform the confirm operation.

So that the execution is not suspended, it is recommended that the backup be performed during a time period when the group/job net/job is not executing.