Top
Systemwalker Operation Manager Troubleshooting Guide
FUJITSU Software

4.2.19 After the Day Change Time, a Job Net not Scheduled to Start Today Changed Status to the "Waiting" Status

Applicable versions and levels

Action

Points to check

Were the Start only when message event has occurred check box and the Once in a day check box selected on the Standard information tab in the Job Net Properties window?

Cause

Job nets for which the Start only when message event has occurred check box and the Once in a day check box were selected will all be Waiting when the day change time arrives.