Machine Administration Guide 2.6
Contents Index PreviousNext

Appendix B Disk Drive Replacement> B.3 Flow of Preventive Replacement

B.3.4 Mounting disks

The procedure for mounting disks after preventive maintenance (hot swap) varies depending on whether GDS4.1A30 or later is used.


Contents Index PreviousNext

All Rights Reserved, Copyright(C) FUJITSU LIMITED 2001-2005
All Rights Reserved, Copyright (C) PFU LIMITED 2001-2005