Machine Administration Guide 2.6
Contents Index PreviousNext

Chapter 3 Model Family-Specific Information> 3.1 PRIMEPOWER1/200/400/600,GP7000F model200/200R/400/400R/400A/600/600R> 3.1.9 Auto Power Control System (APCS) Administration

3.1.9.2 Set Schedule

This section describes how to perform the Set Schedule operation.

Operation

  1. In the GUI menu, click [Automatic Power Control].

    The [Automatic Power Control] screen appears.

  2. Click the [Stop] button in the [Status] field.

    Schedule operation stops.

  3. Select schedule items on the [Automatic Power Control] screen.

    In Set Schedule, the start time or stop time needs to be entered.

  4. Click the [Register] button.

    The entered schedule information is registered.

  5. Click the [Start] button in the [Status] field.

    Schedule operation starts.


Contents Index PreviousNext

All Rights Reserved, Copyright(C) FUJITSU LIMITED 2001-2005
All Rights Reserved, Copyright (C) PFU LIMITED 2001-2005