PRIMECLUSTER Installation and Administration Guide 4.1 (for Solaris(TM) Operating System)
Contents Index PreviousNext

Part 5 Maintenance> Chapter 10 Maintenance of the PRIMECLUSTER System> 10.2 Maintenance Flow

10.2.1 Detaching Resources from Operation

Execute the following for the node that you are going to shut down.

mark3Cluster application failover

If the relevant node is operating, you must first execute failover operation with the hvswitch(1M) command.

For details on how to determine whether the relevant node is operating, see "RMS Tree."

mark3Stopping RMS

After confirming that the relevant node is in either the Offline or Standby state, stop RMS running on the relevant node by executing the hvshut(1M) command.

For details on how to stop RMS, see "4.1 Stopping RMS" in "PRIMECLUSTER RMS Configuration and Administration."

mark3Stopping a node

Execute the shutdown(1M) command to stop the relevant node.


Contents Index PreviousNext

All Rights Reserved, Copyright (C) FUJITSU LIMITED 2005