Applicable versions and levels
Windows versions: V5.0L20 or later
Solaris versions: 5.0 or later
Linux versions: 5.2, V10.0L10 or later
Linux for Itanium versions: V12.0L10 or later
HP-UX versions: 10.0 or later
AIX versions: 10.0 or later
A
To change a job net that terminated abnormally to Waiting status, perform the confirmation operation. The confirmation operation is enabled if you specified Validate job net confirmation (*1) in the Advanced Settings for Verification window displayed when you click Details under Verification at error occurrence in the Use function1 tab of the Define Jobscheduler Startup Parameters window. When Validate job net confirmation is specified and the job net remains in Abended status, it will not be executed even if the conditions for the next execution are satisfied. If the confirmation operation is performed for a job net that terminated abnormally, it is executed the next time the execution conditions are satisfied.
*1: On V13.2.0 or earlier, open the Define Jobscheduler Startup Parameters window and specify this setting in the Use function1 tab.
To change a job net in Paused status to Waiting status, perform the disable operation and then the enable operation. The disabled job net is considered to be completed pseudo-normally and will not be executed even if the execution conditions are satisfied. However, for child job nets, linked job nets, or job nets belonging to a group, the subsequent job nets will be executed if the execution conditions are satisfied. In addition, if you enable a job net that was in Paused status before it was disabled, it will resume the status it had before pausing. If the execution conditions were satisfied when the job net was in Disabled status, the job net will be in Completed status after it is enabled.