Top
ETERNUS SF Express V16.9 / Storage Cruiser V16.9 / AdvancedCopy Manager V16.9 Web Console Guide
FUJITSU Storage

2.5.5 Job Status Pane

Displayed Items

The current processing status information for each processing device is displayed. The displayed items are as follows.

Displayed Items

Explanation

Date

Update time and date of the processing status information (*1)

User ID

User that executed processing

Action

Action name

Status

Processing status. One of the following is displayed:

  • Waiting

  • Executing

  • Completed

Result

Processing result

Target

Target to be processed. The names of the ETERNUS Disk storage system, server, switch, etc. are displayed.

*1: If the Status column is "Waiting", since the Date column indicates the time processing was accepted, it may be different from the time and date output in the Operation History.


Displayed items are updated to the latest status when triggered by any of the following:

  • Automatic updating

    Displayed items are automatically updated at intervals set in the Screen Refresh Interval (Default is 30 seconds).

  • Manual updating

    Click in the menu area.

  • Opening/closing this pane

    Opening this pane always displays the latest updated information.

Note

  • In the following cases, the recorded information is automatically deleted and no longer displayed on this pane.

    • 24 hours has passed since the Status column was changed to "Completed".

    • ETERNUS SF system services on the Management Server are restarted.

  • On this pane, you can check the processing status of the operation performed on Web Console that resulted in the dialog box being displayed as shown below. This pane does not display Command Line Interface (CLI) operations.


How to Open/Close the Job Status Pane

Left-click on the bar that opens/closes this pane.
The above figure shows the screen transition when opening this pane.

Information

Opening this pane displays the latest updated information.


How to Resize the Job Status Pane (Vertically Only)

Resize this pane vertically as follows:

  1. With the Job Status pane opened, place the mouse pointer on the bar that opens/closes this pane.

  2. When the mouse pointer changes as shown in the above figure, drag it vertically.

Note

  • The resize range has upper and lower limits.

  • You cannot resize this pane horizontally.