Top
Systemwalker Operation Manager Troubleshooting Guide
FUJITSU Software

4.9.9 The Error Message "The job net is being saved or controlled" is Displayed

Error message

0225 The job net is being saved or controlled.

Applicable versions and levels

Action 1

Points to check

Does one of the following apply?

Cause

The Jobscheduler service/daemon or other Jobscheduler command performs processing for the operation target job net while it was being saved or controlled.

This message may be displayed in the job net Completed exit or Abended exit when you try to delete a job net that has itself ended.

Action method

Wait for a while (a few seconds) until the Jobscheduler service/daemon or other Jobscheduler command processing is complete, and then reexecute the operation.

By creating an exit program so that the retry is performed a finite number of times every few seconds, it may be possible to avoid this problem.

Action 2

Points to check

Is a nested job net defined in the same definition file?

Cause

In the change processing of nested job nets, if you change a parent job net, the startup days may be re-created (change of job net). Following that, it is not possible to make changes to child job nets and linked job nets.

Action method

The job net control statements of child job nets and linked job nets must precede the job net statements of parent job nets in the definition file.

Action 3

Points to check

Are job nets using the base job net and startup day of the base job net defined in the same definition file?

Cause

In the change processing of base job nets, the startup day of job nets using the startup day of the base job net may be re-created (change of job net). In such cases, job nets using the base job net cannot be changed at the same time.

Action method

Define the job net control statement that is using the base job net and the startup day of that base job net in a separate definition file.