Top
Systemwalker Operation Manager  Reference Guide
FUJITSU Software

6.5 stemCopyProject Operation Change Preset Command

Synopsis

stemCopyProject project name  -d release-day [-sys subsystem number]

Description

To change the master information in advance, the stemCopyProject command copies a project to be pre-registered in the master information to the same subsystem. Using this command, the system creates a project for operation changes (containing definition information on the same job net and job) in order for users to change that project. Contents of the project for operation changes are replaced with the master information on the release day.

Options

project name

Specify the target project of operation changes. The project name must be specified with 45 bytes or less.

-d release-day

Specify the release day in the mmdd format. The allowable range of release days is arbitrary. The operation change takes place during schedule distribution on the specified date.

-sys subsystem number

Specify the number of the subsystem between 0 and 9 that contains the project on which operation change is performed. If omitted, the default is subsystem 0.

Return Values

0:

Completed

A value other than 0:

Abended

Command Location

Windows

Systemwalker Operation Manager installation directory\mpwalker.jm\bin

Solaris
HP-UX
AIX
Linux

/opt/FJSVstem/bin

Privilege Required

System administrator (user belonging to the Administrator group or superuser) privileges are required.

Cautions

Execution Results/Output Format

Completed:

None

Abended:

Error contents are output to the standard output.