Top
PRIMECLUSTER  Installation and Administration Guide 4.4
FUJITSU Software

M.2.11 Operation Procedures and Displayed Items for Cluster Application Setup and Modification

Details on incompatibilities

The procedures and displayed items for creating userApplications and for creating and changing procedure resources have been changed.

Changes

1. Creating a userApplication for standby operation
Before upgrading [PRIMECLUSTER 4.1A20]

To create a userApplication for standby operation, select "CRM" from the "Application type selection menu."

After upgrading [PRIMECLUSTER 4.4A00]

"CRM" is not displayed in the "Application type selection menu."

To create a userApplication for standby operation, select "STANDBY" from the "Application type selection menu."

2. Creating a userApplication for scalable operation
Before upgrading [PRIMECLUSTER 4.1A20]

To create a userApplication for scalable operation, select "Controller" from the "Application type selection menu."

After upgrading [PRIMECLUSTER 4.4A00]

"Controller" is not displayed in the "Application type selection menu."

To create a userApplication for scalable operation, select "SCALABLE" from the "Application type selection menu."

3. Creating a procedure resource
Before upgrading [PRIMECLUSTER 4.1A20]

To create or change a procedure resource, select "CRM" from the "turnkey wizard "CRM"" menu, and then select the resource class name.

Note: Shown below is an example of registering a procedure resource of the BasicApplication class to a userApplication.

After upgrading [PRIMECLUSTER 4.4A00]

The "turnkey wizard "CRM"" menu is not displayed.

To create or change a procedure resource, select "Procedure:resource-class-name" from the "turnkey wizard STANDBY" menu.

Note: Shown below is an example of registering a procedure resource of the BasicApplication class to a userApplication.

4. Changing the timeout value of a procedure resource
Before upgrading [PRIMECLUSTER 4.1A20]

To change the timeout value, select "Flags[0]=OTtimeout-time" and then select "SCRIPTTIMEOUT."

After upgrading [PRIMECLUSTER 4.4A00]

"Flags[0]=OTtimeout-time" is not displayed.

To change the timeout value, select "TIMEOUT."

5. Changing the priority in a resource class of a procedure resource.
Before upgrading [PRIMECLUSTER 4.1A20]

To change the priority in a resource class, select "Priority[0]=priority."

After upgrading [PRIMECLUSTER 4.4A00]

"Priority[0]=priority" is not displayed.

To change the priority in a resource class, select "PRIORITY."

Note

None.