Top
PRIMECLUSTER  Installation and Administration Guide 4.4
FUJITSU Software

C.3.3 Log Volume When Changing Log Levels

Changing log levels allows RMS to investigate details of an error.

When log levels are changed, the volume of dynamic disk resources required for PRIMECLUSTER is increased.

When changing log levels (maximum value of the log level 0), the log volume increased per day is as follows:

Calculation formula for increased log volume per day

(number of nodes x 80) + (number of registered resources x 25) + 25 = log volume increased per day (unit MB)

Note

  • Increased log volume varies depending on the system operation state. It is an approximated value.

    For the actual increased system volume, check the increased movement of log volume under RELIANT_LOG_PATH.

  • If RMS is run for one or more days with changing log level, configure the cron job settings to execute the hvlogclean command in order to avoid shortage of disk space caused by RMS log files. For details, see "C.3.4 Rotation and Deletion of RMS Log Files."