7.2.1 Set Distributed File and PC to be distributed and Distribute

Set the file to distribution file. The file that has been set as the distribution file can be distributed to CT.

Note

The files registered in the File Distribution function will not be displayed in the software download window of CT. Start, stop, re-distribution and result confirmation are performed in the main menu.

Set the file to be distributed.

The procedure is as follows.

  1. Log in to the main menu, and click the Distribution button.

    The initial window of File Distribution will be displayed.

    Description of button is shown below.

    Button Name

    Description

    Update to the Latest Information

    Update to the latest information.

    Add Distribution Task

    Add the task for distributing file.

    Operation list/Execute

    Select the check box of distribution task list and this button will be enabled.

    For the distribution task selected in the check box, select the content expected to be executed from the operation list and click the Execute button. The processing of distribution task will be started.

    There are following options in the operation list.

    • Delete

      Delete the distribution task from CS.
      The task being distributed cannot be deleted.

    • Start

      Start distribution for the tasks for which the distribution is not started, has been stopped or ended abnormally.

    • Stop

      Stop the distribution for the task that is being distributed.

    Description of the items in the Distribution Task List is as follows.

    Item

    Description

    Operation (check box)

    When processing such as deletion is required, select the distribution task to be operated.

    Update Date/Time

    Display the date and time when distribution tasks are registered and updated.

    Distribution Task Name

    Display the name corresponding to the distribution task.

    The details of distribution task can be viewed by clicking the distribution task name.

    Progress

    Display the progress of distribution task.

    The color of column chart shows the percentage of progress.

    • Green

      It shows the percentage of distribution completed normally.

    • Red

      It shows the percentage of failed distribution due to some reasons.

    • Gray

      It shows the percentage that is not distributed.

    The meaning of icons is described as follows.

    : Distributed normally.

    : Distribution has ended abnormally.

    : Distribution is not started yet.

    : Distributing.

    : Distribution is stopped.

    Beside the icon, the total number of "number of files x distribution target PC" will be displayed as "Number of items". The meanings are described as follows.

    • n items in total

      Display the number of items to be distributed.

    • n items are normal

      Display the number of items that has completed distribution normally.

    • n items are abnormal

      Display the number of items failed to be distributed due to some reasons.
      For failed content, click the distribution task name to check the detailed condition tab.

    • n items are being distributed

      Display the number of items being distributed.

    • n items are not distributed

      Display the number of items that are not distributed.

    Created

    Display the section to which the administrator who created the distribution task belongs.

    When it is created by system administrator, it is displayed as the fixed name of "Management target".

    Filtering by [Created]

    The content in the distribution task list can be narrowed down according to Created.

    The content displayed in the distribution task list will be different depending on the authority of user logging in to the main menu.

    • When the authority is system administrator

      • Management target only

        Only the distribution task of which the Created is "Management target" will be displayed.

      • All sections

        All distribution tasks will be displayed regardless of Created.

    • When the authority is section administrator

      • Affiliated section only

        Only the distribution task created by the section to which the login user belongs will be displayed.

      • All sections that can be viewed

        The distribution tasks created by the section to which the login user belongs and distribution tasks created by all the lower-level sections will be displayed.

    Point

    Maximum number of managed tasks

    Maximum 100 tasks can be managed on the system.

    Tasks cannot be deleted automatically, so delete the tasks that have been completed normally and are not needed in operation.

    When the number of tasks on the system reaches 100, new distribution task will not be added even if the Add Distribution Task button is clicked.

  2. Click the Add Distribution Task button.

    The window for selecting the file to be distributed and the distribution target PC will be displayed.

    The content of setting item is shown as follows.

    Item

    Description

    Distribution Task Name

    Enter the name of task to be distributed within 30 multi-byte or 60 single-byte characters.

    It displays "Created on" and "Created User Name" in default.

    • Start the distribution immediately after adding

      After this item is selected and the OK button is clicked, distribution will be started immediately.
      When preparing for distribution, do not select this item and click the OK button.

    Distribution Target Folder

    Specify the folder name for saving distributed files on CT using up to 128 fullwidth characters or 256 halfwidth characters.

    When specifying with absolute path, specify an existing folder on CT. When it is unable to create a folder or a drive that does not exist has been specified, error will occur.

    When specifying a relative path or the distribution target folder is omitted, files will be saved under "CT installation directory\contents" on CT.

    In addition, system environment variables and macro can be used in distribution target folder. (User environment variables such as %HOMEDRIVE% .etc cannot be used.)

    • System environment variables

      The system environment variables that have been set can be used on CT. For example, specify to "%systemdrive%\xxxx".

    • Macro

      <ProgramFiles>

      It indicates the folder used by application. For example, "C:\Program Files".

      <ProgramFilesX86>

      It indicates the folder used by 32bit applications. Example in case of 64bit OS: "C:\Program Files (x86)".

    In addition, if the file to be distributed has already existed under the distribution target folder, it will be overwritten.

    Progress

    It is the same as the progress displayed in the initial window.

    Created Section

    Display the section to which the administrator that created the distribution task belongs.

    Wait for the completion of "Action after Distribution"

    Set the waiting for completion when executing the file specified in Action after Distribution.

    When processing the file specified in Action after Distribution after one file processing has completed, select Yes.

    Authority of "Action after Distribution"

    There are the following two methods to execute the file specified in Action after Distribution.

    • Run as service

    • Run as logon user

    Update Date/Time

    Display the date and times when distribution task is registered and updated.

  3. In the Distribution settings tab in the bottom left field of the window, click the Add button of Distributed file and select the file to be distributed.

    After a file is selected, it will be added to the list of files to be distributed.

    In case of wrong registration, select the file that should be deleted from the list and click the Delete button.

    Point

    Number of files can be registered in a single task

    In a single task, maximum 10 files can be registered.

    When there are more than 10 files, compress it to zip file in advance or register separately.

    Note

    • The file/folder properties of registered file (read-only .etc) cannot be kept after distribution. When it is required to set file/folder properties, reset the properties after downloading.

    • When uploading the file that is being used, the file after uploading will be a 0-byte file. No matter if the original file is 0 byte or not, it will be displayed as 0 byte after uploading. Stop using this file and upload again.

    • Do not upload a file that is more than 2GB. Once uploaded, the browser cannot be operated.

    Point

    About Action after Distribution

    The content specified in the list of Action after Distribution will be operated after the distribution of all files registered in the same distribution task has completed.

    The operation timing is shown as follows.

    • When Authority of "Action after Distribution" is Run as service

      Processing will be performed right after distribution no matter whether the user has logged on to Windows or not.

    • When Authority of "Action after Distribution" is Run as logon user

      Action after Distribution will be performed after the user has logged on to Windows. If there is no user logged on to Windows, Action after Distribution will not be performed until logon to Windows.

    Open the file displayed on the window according to the Run as logon user method.

    When the file displayed on the window is opened according to the Run as service method, the window of application will not be displayed on the window of logon user, and it will be in stopped status sometimes during the processing.

    When the application for which Wait for the completion of "Action after Distribution" is set to Yes is in stopped status all the time and cannot be terminated, Distribution has ended abnormally will be displayed in Progress after 3 hours.

    The Action after Distribution is performed according to the sequence of adding files to distribution task.

    The content displayed in the list may vary with file extension.

    • When the extension is not "zip"

      The following can be specified.

      No

      No processing will be performed after distribution.

      Open

      Open the file with related application defined by logon user.

      Open in the background

      Specify this option if the files to be distributed have an extension of .exe, .bat, .msi, .vbs, or .wsf.
      The files will be opened in the background after distribution.

      Note

      For files that require inputs, do not select Open in the background and distribute.

      If they are distributed, the process will continue to run until the files opened in the background are closed.

    • When the extension is "zip"

      The following can be specified.

      No

      No processing will be performed after distribution.

      Extract the compressed folder

      Extract automatically according to the structure within the compressed folder on PC. The target directory of extraction is Distribution Target Folder.

      file Open

      Open the file with related application defined by logon user.

      file: All file names up to the second level within the compressed folder

      Open file in the background

      Specify this option if the files in the compressed folder have an extension of .exe, .bat, .msi, .vbs, or .wsf.
      The files will be opened in the background after distribution.

      file: File names with an extension of .exe, .bat, .msi, .vbs, or .wsf, up to the second level within the compressed folder

      Note

      For files that require inputs, do not select Open in the background and distribute.

      If they are distributed, the process will continue to run until the files opened in the background are closed.

    In addition, after Action after Distribution has been specified, control for Action after Distribution can be set for each distribution task.

    Here, when the check box Yes of Wait for the completion of "Action after Distribution" item is selected, for the files of which Open has been selected, as the result of waiting for completion of execution, the return value of file will be output to detailed information.

  4. Click the Add button of Target PC(s) in the bottom right field of window.

    The PC selection window will be displayed.

    Note

    If the PC in which the check box is not displayed is the CT prior to V13.2.0 or the command mode CT. Distribution cannot be performed.

    Select the target Target PC(s) from the PC selection window, select the check box and click the OK button, the PC will be added to the list of distribution target PC.

    Point

    Number of PCs can be registered in a single task

    In a single task, maximum 2000 PCs can be registered.

    When there are more than 2000 PCs, separate the task and register again.

  5. If there is no problem in the settings, click the OK button.

    When Start the distribute immediately after adding is selected, and the OK button is clicked, the following message box will be displayed.

    Click the OK button in the message box, the distribution task will be added and file distribution will start.

    Click Cancel to cancel the file distribution.