Top
ServerView Resource Orchestrator Cloud Edition V3.2.0 User's Guide for Infrastructure Administrators
FUJITSU Software

6.2 Capacity Planning Operations

This section explains capacity planning operations.


How to open the Configuration Management screens

  1. From the ROR console, select the [Dashboard] tab, then select [Capacity Planning] in the displayed sub tab.

  2. The [Capacity Planning] window will be displayed.

Note

Do not perform operations in the [Capacity Planning] window using the right-click shortcut menu.

Capacity planning layout

When started, the following [Capacity Planning] window is displayed:


The [Capacity Planning] window is made up of the following elements:

Component

Description

[Conditions] window

Set categories, reports, and the analysis conditions for the various reports. Operations in this window are described in following sections:

[Results] window

The contents of the reports are displayed.



Conditions window layout


Basic operations in the conditions window

Component

Description

Category

Select a category that matches the purpose of operation.

Report

Select a report that matches the purpose of operation.

Target Settings

A specification relating to the target of the report.

View Settings

Specify report data intervals, number of display items, and file output.
The way to specify the number of display items depends on the type of report.
Available memory capacity is used to avoid system stoppages due to extremely low memory availability, so is extracted from the lowest up.
The number of data items that can be displayed in the graph is approximately up to 10.

Period

Specify the periods for analysis.

Operation button
(Display)

Button for displaying the results of analysis as a report (content).