This section explains capacity planning operations.
How to open the Configuration Management screens
From the ROR console, select the [Dashboard] tab, then select [Capacity Planning] in the displayed sub tab.
The [Capacity Planning] window will be displayed.
Note
Do not perform operations in the [Capacity Planning] window using the right-click shortcut menu.
Capacity planning layout
When started, the following [Capacity Planning] window is displayed:
The [Capacity Planning] window is made up of the following elements:
Component | Description |
---|---|
[Conditions] window | Set categories, reports, and the analysis conditions for the various reports. Operations in this window are described in following sections: |
[Results] window | The contents of the reports are displayed. |
Conditions window layout
Basic operations in the conditions window
Component | Description |
---|---|
Category | Select a category that matches the purpose of operation. |
Report | Select a report that matches the purpose of operation. |
Target Settings | A specification relating to the target of the report. |
View Settings | Specify report data intervals, number of display items, and file output. |
Period | Specify the periods for analysis. |
Operation button | Button for displaying the results of analysis as a report (content). |