4.3 Operation after Switchover

This section explains notes on operation until failback of the switched configuration is performed after switchover.


When Performing Tenant Switchover while the Switchover Source Site is Operating

When the Accounts Manager Invoices Usage Charges

The procedure is as follows.

When Tenant Switchover was Performed

The following limitations apply to L-Platform templates:

This unavailable template information becomes available when the resources of all the global pools are switched over.


When Switchover Was Performed Using the Active-Active Operation

After switchover, do not mix resources that have been switched from the switchover source site with resources that were already on the switchover destination site. If mixed, resources cannot be found and failback will fail.

Patterns where resources are mixed are as follows:

In order to identify on which site the corresponding resources were created, it is recommended to add their site names to the beginning of the resource names.

For details, refer to "Items to be Different between Sites" of "Items to be Different between the Primary and Backup Sites" in "2.6 Configuration of the Primary and Backup Sites".


When Additional Recovery Is Planned

When additional recovery is planned on the switchover source site after the switchover operation, do not perform the following operations.

When Switchover Was Performed Using the Blade Chassis Degradation Configuration

When switchover was performed using the blade chassis degradation configuration, perform the following operations after the switchover, as necessary.