Top
ServerView Resource Orchestrator Cloud Edition V3.1.2 DR Option Instruction
FUJITSU Software

4.2.20 Resuming Replication of the Disk with the Switchover Information Folder [Switchover Source Site or the Site for Which the Replication Definitions Have Been Created]

Execute the following operations on the switchover source site or the site on which replication was defined in preparation for the next switchover.

  1. On the switchover destination site, unmount the "switchover information folder" disk that was mounted in "4.2.5 Mounting the Switchover Information Folder [Switchover Destination Site]".

  2. In the switchover source site or the site on which replication was defined, resume the replication of the disk containing the "switchover information folder" from the switchover source site to the switchover destination site, which was stopped in "4.2.4 Stopping Storage Replication [Switchover Source Site or the Site for Which Replication Definitions Have Been Created]".

Example

Example for the "switchover information folder" to be unmounted

[Windows Manager]
E drive

[Linux Manager]
/DRImport