Top
ServerView Resource Orchestrator Cloud Edition V3.1.2 User's Guide for Tenant Administrators
FUJITSU Software

9.3 Approving an Application

An approver approves application processes.
The approver is the Tenant Administrator specified as the forwarding destination at the time of application.

Point

  • If the requirement to be approved is set for an application process, an approver approves the application process. When the application process is forwarded, an approval request email is sent to the approver.

  • Refer to "Appendix A Emails Sent during L-Platform Operations" for information on the email sent when an application process is approved.

Perform the following steps to approve an application process:

  1. Click the URL given in the approval request email. Alternatively, login to the ROR console and select the [Requests] tab.

  2. In the Task Filters drop-down list on the My Tasks window, select [My Tasks].

    A list of tasks that are not yet approved is displayed.
    In the [Priority] field in [My Tasks] under the [Summary] tab, give the tasks a priority using a number between 0 and 2147483647. The default value is 8.
    The higher the number of a task, the higher its priority level. Setting the priority level of tasks also enables them to be sorted in order of priority in task lists.

  3. Select the process instance task, and then click the [Details] tab.

  4. Select the [Application] tab on the [Form] panel.
    Check the content of the application.
    For L-Platform usage applications (when the L-Platform template has been reconfigured) and for L-Platform reconfiguration applications, information from prior to any modifications can also be displayed under [Details].
    Furthermore, estimated price for corresponding L-Platform can be displayed as accounting information by selecting [Details] on the [Application] tab on the [Form] panel.

  5. Select the [Approve] tab.
    If required, enter a comment in [Approval comment.].

  6. Click either the [0: Approve] button or the [1: Reject] button on the MakeChoice panel.

    If an error occurs during approval processing after the [0: Approve] button is clicked, an error notification email is sent to the Infrastructure Administrator.
    If the [1: Reject] button is clicked, a rejection notification email is sent to the subscriber.

    Point

    Application process assessment

    Application process assessment is performed by the Infrastructure Administrator.

    If the requirement to be assessed is set for an application process, an assessment request email is sent to the Infrastructure Administrator when the approver clicks the [0: Approve] button. When the Infrastructure Administrator accepts the application, the requested processing is performed.

    If the requirement to be assessed is not set for an application process, the requested processing is performed when the approver clicks the [0: Approve] button.

    Usage fees checks

    Estimated price for the L-Platform will only be displayed when accounting display settings have been enabled by a system administrator.

    Note that usage fees shows the prices at the following points and will not be recalculated even if there are changes in prices of configuration elements after this. Please be aware of this issue:

    • Prices at the time of a new L-Platform usage application

    • For L-Platform usage applications from a 'save configuration', prices are as per the time of the L-Platform save configuration

    • Prices at the time of L-Platform reconfiguration

    Note

    • If the [0: Approve] button or the [1: Reject] button on the Make Choice panel is clicked without the [Details] tab being selected or without the [Status] tab on the [Details] tab being selected, the following message is displayed:

      All the forms are not accessed in Details Tab. Do you want to continue?

      To continue processing without checking the form, click the [OK] button. To check the form, click the [Cancel] button, and then select the [Details] tab or select the [Status] tab on the [Details] tab.

    • If the requirement to be assessed is not set for an application process and an L-Platform management function occurs during application approval, an error notification email is sent to the Infrastructure Administrator.

    • When approving applications and [Failed] is displayed as the result in the [Result Summary] window, contact the tenant administrator with the process instance name that failed and the error details and have them investigate the error and take action as necessary.
      Details about the errors are displayed by clicking [Details] in the comments in the [Result Summary] window.