Top
PRIMECLUSTER Global Link Services Configuration and AdministrationGuide 4.2Redundant Line Control Function

4.6.5 Recovery procedure from line failure in GS/SURE linkage mode

No special operation is required because recovery is automatically made after a line failure has occurred.

However, some applications may need to be restarted.