Synopsis
stemMoveProject project name -fd unchanged-release-day -d changed-release-day [-sys subsystem number
Description
The stemMoveProject command changes the release day of the project for operation changes.
Options
project name
Specify the target project of operation changes.
-fd unchanged-release-day
Specify the unchanged release day in the mmdd format.
-d changed-release-day
Specify the changed release day in the mmdd format.
-sys subsystem number
Specify the number of the subsystem between 0 and 9 that contains the project on which the release day is to be changed. If omitted, the default is subsystem 0.
Return Values
Normal termination
Abended
Command Location
Windows | Systemwalker Operation Manager installation directory\mpwalker.jm\bin |
Solaris | /opt/FJSVstem/bin |
Privilege Required
System administrator (user belonging to the Administrator group or superuser) privileges are required.
Cautions
When the operation change has ended unsuccessfully on a process date (release day), you cannot change the release day of the project for operation changes to the failed process date.
Execution Results/Output Format
None
Error contents are output to the standard output.