Applicable versions and levels
Windows versions: V5.0L10 to V12.0L11
Solaris versions: 5.0 to 12.1
Linux versions: 5.2, V10.0L10 to V12.0L10
Linux for Itanium versions: V12.0L10
HP-UX versions: 5.1 to 11.0
AIX versions: 5.1 or later
DS versions: V20L10
Action
Points to check
Have multiple network cards been installed on the schedule server? Additionally, has the primary host name of the schedule server been resolved on the execution server?
Cause
If multiple network cards have been installed on the schedule server, the execution server communicates with the schedule server using the primary host name or IP address of the schedule server.
If the continuous execution mode of the network job is disabled, the execution server communicates with the schedule server to confirm whether it is running while the network job is being executed. If multiple network cards have been installed on the schedule server, and the primary host name of the schedule server cannot be resolved on the execution server, it cannot communicate with the schedule server. The execution server determines that the schedule server is not running, and cancels the job.
Action method
Take action so that the primary host name of the schedule server can be resolved on the execution server.