Top
Systemwalker Operation Manager Troubleshooting Guide
FUJITSU Software

4.13.1 After the System Time is Changed, the Job Net Does not Start on Schedule

Applicable versions and levels

Action

Points to check

Was the system time changed after the Jobscheduler service/daemon was stopped?

Cause

Jobscheduler performs scheduling processing based on the current time of the system, therefore, if the system time is changed during the operation, the job net may not start according to schedule, and the service behavior may be abnormal.

Action method

Refer to "Action 2" in "4.2.1 A Job Net Started at an Unexpected Time" for information on the cause and action method.