Top
Systemwalker Operation Manager Troubleshooting Guide
FUJITSU Software

4.1.17 Even though the Preceding Job Net of the Job Nets in the Group was Disabled, the Succeeding Job Net does not Start

Applicable versions and levels

Action

Points to check

Was the Valid execution time option set for a disabled job net?

Cause

Even for a disabled job net, if the Valid execution time option is set, the job net will not be skipped if it does not satisfy the execution condition. For this reason, the succeeding job net will not start either.

Action method

Wait until the execution condition for the preceding job net is met.