Top
PRIMECLUSTER DR/PCI Hot Plug User's Guide

1.3.1 SPARC M10 operation modes

Note

When adding or deleting I/O resources to/from the existing domain physically, you need to reboot the following domains where the I/O resources are changed: the control domain, I/O root domain, and I/O domain.