This appendix describes the main contents for change of this manual.
Number | Edition | Part and Chapter | Details |
---|---|---|---|
1 | 2 | 5.1.2 Configuring the Shutdown Facility | The setting method of SPARC Enterprise M3000, T1000, T2000, T5120, T5220, or T5440 was added. |
2 | 2 | 6.2.2 GDS Configuration Setup | Notes when two or more single nodes were shifted to the cluster system were added. |
3 | 2 | 6.6.1.2 Creating Fsystem Resources | The attention when the file lock was used was added. |
4 | 2 | 9.1 Adding a Node | "(7) Setting of GDS" was added to the procedure. |
5 | 2 | 9.1.3 Connecting a Node | The procedure when the GFS shared file system was used was added. |
6 | 2 | 9.1.7 Setting Up GDS | The paragraph was newly added. |
7 | 2 | 9.1.9 GFS Shared Settings | The operation procedures were corrected. |
8 | 2 | Chapter 12 | The version levels of the corresponding products were updated. |
9 | 2 | A.9 Cluster Application Worksheets | The value of the default of "CLUSTEREXCLUSIVE" and "AUTORECOVER" was corrected. |
10 | 2 | A.10.1 Cluster Configuration Worksheet | "ALOM" and "ILOM" were added to "Shutdown Facility". |
11 | 2 | A.5.1 CF Configuration | Added setting method for asynchronous RCI monitoring. |
12 | 2 | Glossary | Added definitions for "domain", "control domain", "guest domain", "control domain cluster", and "Logical Domains Manager (LDoms)". |
13 | 2 | Appendix H Using PRIMECLUSTER in LDoms (Logical Domains) Environments | Added new appendix. |
14 | 3 | Throughout document | Changed company name to "Fujitsu Technology Solutions". |
15 | 4 | 5.1.2.4.1 Checking Console Configuration | Added information on ILOM 3.0. |
16 | 4 | 6.6.1.6.1 Prerequisites | Added precaution on the state transition procedure. |
17 | 4 | A.5 Kernel Parameter Worksheet | Added precaution on the state transition procedure. |
18 | 4 | F.1 Registering a Procedure Resource | Added precaution on the state transition procedure. |
19 | 5 | 5.1.1 Setting Up CF and CIP | Added description for CIP nodenames to the note. |