Top
Systemwalker Service Quality Coordinator User's Guide (Console Edition)
Systemwalker

5.2.7 Period Specifications

Periods are explained.

Item name

Description

Period/

Analysis Period

Specify the period of the analysis.

Select the minute, hour, day, month and year using a drop-down list box to specify the date and time that analysis will start and stop.

Forecast Date

When the preview is done, the specified forecast until the date is done.

The date is selected from the pull-down menu.

This can be set in the following reports.

  • Future forecast display

  • Resource pool (CPU) (demand forecast)

  • Resource pool (Memory) (demand forecast)

  • VM pool (CPU) (demand forecast)

  • VM pool (Memory) (demand forecast)

  • Storage pool (demand forecast)

  • Network pool (demand forecast)

  • Server pool (demand forecast)

  • Address pool (demand forecast)

  • Request count (Future prediction)

The Period and Analysis Period is decided according to the operand specified for "5.3.1 sqcMakeReport(Scheduled Report Creation Command)" command.