Top
Systemwalker Service Quality Coordinator User's Guide (Console Edition)
Systemwalker

4.9.49 Operation Manager Project

Item

Description

Evaluation

Job multiplicity of each Project

Allows the maximum job concurrency in different projects to be ascertained and compared.

Check deviations and peaks in the job concurrency of different projects.

If the CPU usage rate, available memory capacity, disk usage rate, or some other item exceeds a warning level, review job schedules and reduce the level of concurrency.

Job net multiplicity of each Project

Allows the maximum job net concurrency in different projects to be ascertained and compared.

Check deviations and peaks in the job net concurrency of different projects.

Number of execution waiting jobs of each Project

Allows the maximum number of pending jobs in different projects to be ascertained and compared.

Check deviations and peaks in the number of pending jobs in different projects. If the number of pending jobs is large, review the job execution schedule.

Execution waiting time of each Project

Allows the maximum execution wait time in different projects to be ascertained and compared.

Check deviations and peaks in the job execution wait times of different projects. If the execution wait time is long and the CPU usage rate, available memory capacity, disk usage rate, or some other item exceeds a warning level, take measures to reduce the level of job concurrency.

Number of jobs that have exceeded the predicted time of each Project

Allows the number of jobs with execution time overruns in different projects to be ascertained and compared.

Check deviations and peaks in the number of jobs with execution time overruns in different projects. If the number of jobs with execution time overruns is large and the CPU usage rate, available memory capacity, disk usage rate, or some other item exceeds a warning level, take measures to reduce the level of job concurrency.

Number of completed jobs by project

Allows the number of completed jobs in different projects to be ascertained and compared.

Check deviations and peaks in the number of completed jobs in different projects.

The number of completed jobs by project also includes the following number of error jobs by project.

Number of error jobs by project

Allows the number of error jobs in different project to be ascertained.

Check the number of error jobs in different projects.