| Interstage Shunsaku Data Manager Operator's Guide - Microsoft(R) Windows(R) 2000/ Microsoft(R) Windows Server(TM) 2003 - - UNIX - | 
			Contents
			Index
			![]()  
		 | 
	
| Appendix E Conflict Relationships | > E.2 Conflict Relationships between Commands | 
The conflict relationships for conductor commands are as follows:
| 
 
  | 
 Following command  | 
||
|---|---|---|---|
| 
 shuncstate  | 
 shuncterm  | 
||
| 
 Leading command  | 
 shuncstate  | 
 Can be executed simultaneously  | 
 Can be executed simultaneously  | 
| 
 shuncterm  | 
 Can be executed simultaneously  | 
 Cannot be executed simultaneously (*1)  | 
|
*1) The following command will return an error. However, if an attempt is made to forcibly stop Shunsaku by executing shunsysstop as the following command with the -e option specified, the command will stop Shunsaku without returning an error. In this case, the leading command may return an error.
			Contents
			Index
			![]()  
		 |