Interstage Shunsaku Data Manager Operator's Guide - Microsoft(R) Windows(R) 2000/ Microsoft(R) Windows Server(TM) 2003 - - UNIX -
Contents Index PreviousNext

Appendix E Conflict Relationships> E.2 Conflict Relationships between Commands

E.2.1 Conflict Relationships for Conductor Commands

The conflict relationships for conductor commands are as follows:

[Table E-4 Conflict Relationships for Conductor Commands]

Following command

shuncstate
shunsysstate
shunprtmsg

shuncterm
shunsyscfgedit
shunsysstart
shunsysstop

Leading command

shuncstate
shunsysstate
shunprtmsg

Can be executed simultaneously

Can be executed simultaneously

shuncterm
shunsyscfgedit
shunsysstart
shunsysstop

Can be executed simultaneously

Cannot be executed simultaneously (*1)

*1) The following command will return an error. However, if an attempt is made to forcibly stop Shunsaku by executing shunsysstop as the following command with the -e option specified, the command will stop Shunsaku without returning an error. In this case, the leading command may return an error.


Contents Index PreviousNext

All Rights Reserved, Copyright (C) FUJITSU LIMITED 2006