Appendix D Estimating Resources

D.1 Estimating Resources for Each Server

This section explains how to estimate resources for each Shunsaku server.

Resources can be estimated by using estimation formulas to calculate the resources for the processes on each server, and then totaling the results.

The estimation procedure is as follows:

  1. Confirm which processes have been allocated to each server.

    Refer to 2.1 System Configuration and Installation Guide for more details.

  2. Estimate process resources.

    Use the estimation formulas to estimate the resources for each process.

  3. Total the process resources for each server.

    Determine the resources required for each server by totaling the resources required for the processes on each server.