PRIMECLUSTER Installation and Administration Guide 4.2 (Linux for Itanium)
Contents Index PreviousNext

Part 5 Maintenance> Chapter 9 Maintenance of the PRIMECLUSTER System> 9.2 Maintenance Flow

9.2.1 Detaching Resources from Operation

Execute the following for the node that you are going to shut down.

mark3Cluster application failover

If the relevant node is operating, you must first execute failover operation with the "hvswitch" command.

For details on how to determine whether the relevant node is operating, see "RMS Tree."

mark3Stopping RMS

After confirming that the relevant node is in either the Offline or Standby state, stop RMS running on the relevant node by executing the "hvshut" command.

For details on how to stop RMS, see "5.4.3 Stopping RMS" in "PRIMECLUSTER Reliant Monitor Service (RMS) with Wizard Tools Configuration and Administration Guide."

mark3Stopping a node

Execute the "shutdown(8)" command to stop the relevant node.


Contents Index PreviousNext

All Rights Reserved, Copyright(C) FUJITSU LIMITED 2006